Solusi Kustom Untuk Perawatan Trek

JG150ST 15-ton wheeled railway excavator with sleeper grab
JG150ST wheeled hi-rail excavator is equipped with professional sleeper grab. The wheel-rail dual-purpose chassis supports flexible road transfer and on-track construction. The sleeper grab features stable clamping to grab, transport and replace sleepers rapidly. With precise and flexible hydraulic control, it fits narrow construction areas such as tunnels, stations and main lines. Automatic sleeper replacement cuts manual work and safety hazards, greatly improving operation efficiency and shortening railway maintenance window time.
Nomor Barang :
JG150STPesanan (MOQ) :
1Pembayaran :
FOBAsal Produk :
CHINAWarna :
yellow/ orange/ blue(custonizable)Pelabuhan Pengiriman :
xiamenWaktu tunggu :
30-60 daysBerat :
15000 kgThe matched sleeper grab of JG150ST wheeled railway excavator provides powerful and stable clamping force to safely lift and shift old and new sleepers without slipping. It completes full sleeper replacement procedures within limited maintenance window, cutting track shutdown duration and improving overall rail transport efficiency. The machine avoids heavy manual sleeper carrying to reduce construction accidents. Robust grab structure and smooth hydraulic system ensure long service life, uniform operation, stable track structure and extended service life of railway lines.

Performance parameter
| (Length*width*height)Transport Dimensions | 9700*2500*3200mm |
| Axle base | 2750mm |
| Wheel Base (front/ rear) | 1900mm |
| Ground clearance of counterweight | 1290mm |
| Min ground clearance | 310mm |
| Rotation angle of Machine | 360° |
| Machine weight | 15000kg |
| Engine model | Cummings |
| Rated Power | 97KW |
| Rated Speed | 2200r/min |
| Hydraulic system working pressure | 32Mpa |
| Hydraulic system flow | 270L/min |
| Variable piston pump | 2*63ml/r |
| Grade Climbing ability | 58%/30° |
| Hydraulic Tank Capacity | 200L |
Note: The product parameters are based on the actual product, and the right of interpretation and final interpretation belong to the company.
--------------占位---------------