Solusi Kustom Untuk Perawatan Trek

The JG180S Wheeled Railway Sleeper Changing Machine Railway Excavator is a revolutionary piece of equipment designed specifically for the railway construction and maintenance industry. With its advanced technology and robust design, it offers unparalleled efficiency and reliability in sleeper changing operations.
Nomor Barang :
JG180LTPesanan (MOQ) :
1Pembayaran :
L/C or T/TAsal Produk :
ChinaWarna :
yellowPelabuhan Pengiriman :
xiamenWaktu tunggu :
15-45daysBerat :
18000KG
Hundreds of sleepers can be replaced within a few hours, shortening the maintenance time of the lines, reducing the downtime of railways and improving operational efficiency.It has reduced the direct exposure of workers at the track site and lowered the accident rate. The overall safety of the working environment has been improved.Ensure that each sleeper is accurately replaced to enhance the stability and durability of the track and extend the service life of the railway.
|
Range of operation |
|
|
Boom length |
4200mm |
|
Arm length |
2000mm |
|
Maximum digging reach |
7200mm |
|
Maximum digging depth |
4100mm |
|
Maximum digging force |
90KN |
|
Maximum digging height |
8000mm |
|
Maximum dumping height |
6000mm |
|
Ballast undercutter |
|
|
Rotation speed (high speed / low speed) |
44-66r/min |
|
Maximum Torque |
8.8KN |
|
Effective length of ballast undercutter |
3200 |
|
Work efficiency |
20-40m/h |
|
Maximum Working Radius |
6000mm |
|
Ballst tamping head |
|
|
Vibration Frequency |
35-63HZ |
|
Exciting Force |
≥21KN |
|
Tamping Depth |
≥90mm |
|
Grapple rotation angle |
45° |
|
Working efficiency |
≥120pcs/h |
|
Sleeper changer head |
|
|
Max. opening width of grab |
650mm |
|
Min. opening width of grab |
200mm |
|
Max. radius grabbing weight |
2t |
|
Max. width of grab |
3000mm( customizable) |
|
Grapple rotation angle |
360° |
|
Dimensions |
|
|
(Length*width*height)Transport dimensions |
9700*2500*3190mm |
|
Axle base |
2750mm |
|
Track wheel travels the wheelbase |
4450mm |
|
Track wheel ADAPTS to the gauge |
1520mm |
|
Wheel base (front/rear) |
1900mm |
|
Ground clearance of counterweight |
1290mm |
|
Min. ground clearance |
310mm |
|
Back-end radius of gyration |
1940mm |
|
Tech performance and specification |
|
|
Angle of rotation |
360° |
|
Machine weight |
17000kg |
|
Engine model |
Cummins QSB5.9 |
|
Rated power |
154KW |
|
Rated speed |
2200r/min |
|
Hydraulic system working pressure |
32Mpa |
|
Hydraulic system flow |
270L/min |
|
Variable piston pump |
2*63ml/r |
|
Max. hauling force |
76.5KN |
|
Walking speed |
25km/h |
|
Grade climbing ability |
58%/30° |
|
Tyre model |
9.00-20 |
|
Volume of bucket |
0.5m³ |
|
Fuel quantity |
≥6L/h |
|
Fuel tank capacity |
240L |
|
Hydraulic oil tank capacity |
200L |
|
Note: Product parameters are subject to the actual product, and the right of interpretation and final interpretation belongs to the company. |
|
Product Overview
18ton Wheeled Railway Sleeper Changing Machine Railway Excavator
JG180S Seigong 18 tons wheel rail dual-use sleeper replacement machine, designed for efficient maintenance and upgrading of railway. Equipped with male/rail dual mode chassis, single operation can replace 12-18 sleepers per hour, synchronous completion of ballast leveling. It is compatible with many accessories such as crushing, tamp and barrier cleaning. It is suitable for the construction of existing railway skylight period, urban rail night maintenance and emergency rescue. Compared with traditional manual operation, the efficiency is improved by 400% and the labor cost is reduced by 80%.


Product Advantages

Effiient:Hundreds of sleepers can be replaced within a few hours, shortening the maintenance time of the lines, reducing the downtime of railways and improving operational efficiency.
Safety:It has reduced the direct exposure of workers at the track site and lowered the accident rate. The overall safety of the working environment has been improved.
Precision:Ensure that each sleeper is accurately replaced to enhance the stability and durability of the track and extend the service life of the railway.
Technical Specifications

Application scenarios


Q&A
Q: What are the main functions and advantages?
A: Efficient and automated replacement of railway sleepers, supporting multiple track specifications, and made of durable materials.
Q: Delivery time and mode of transportation?
A: The standard delivery time is 30 to 45 days, and sea transportation is supported.
Q: After-sales service?
A: We have established a global service system covering pre-sale, in-sale and after-sale services, and can respond to customer demands within 48 hours. Remote technical support and rapid global spare parts supply ensure that equipment malfunctions are resolved promptly.
Q: Is there support for machine customization to adapt to the track standards of different countries?
A: Yes, parameters can be customized as needed, on-site installation guidance and technical training are provided to meet the diverse demands of the world.